Tengah Garden Walk EC Key Collection: Defect Inspection Checklist

Reading Time: 3 minutes

Reading Time: 3 minutes

Quick Answer: At Tengah Garden Walk EC key collection, you have a 1-year Defects Liability Period (DLP) to report defects for free rectification by the developer. Use a systematic room-by-room inspection — check cracks, water seepage, tile alignment, doors/windows, plumbing, and electrical. Document everything with photos.

Key collection day is one of the most important moments in your EC purchase. What you find — and document — on that day determines what gets fixed for free versus what you pay for.

Here’s the room-by-room inspection protocol.

The 1-Year Defects Liability Period (DLP)

Qingjian, like all Singapore developers, provides a 1-year DLP from TOP. During this period:
– Structural defects: developer must rectify
– Workmanship defects: developer must rectify
– Material defects: developer must rectify

After the DLP expires, you pay for everything out of pocket. This is why key collection inspection matters so much.

Submit all defects formally in writing (not just verbal) within the DLP to protect your rights.

Inspection Tools to Bring

– Phone with camera and video (document everything)
– Measuring tape
– Marble or round object (test floor levelness)
– Torchlight
– Tissue paper (test window seals)
– Screwdriver (test power sockets)
– Long ruler or spirit level

Room-by-Room Checklist

Common Areas (entrance, corridor, yard):
☐ Hollow tiles (knock each tile — a dull sound indicates hollow underneath)
☐ Cracked or chipped tiles
☐ Uneven tile grout lines
☐ Main door operation (stiff, doesn’t close properly, gap at frame)
☐ Roller blind / mosquito mesh on yard/utility windows
☐ Yard tap water flow and drainage

Living and Dining:
☐ Hollow tiles throughout
☐ Tile levelness (roll a marble — it should stay still)
☐ Hairline cracks in walls or ceiling
☐ Ceiling height inconsistencies
☐ All power sockets work (bring a phone charger)
☐ Light switch operation
☐ Balcony door seals (slide tissue at closed door — no movement = good seal)
☐ Balcony drain clear and not blocked

Kitchen:
☐ Cabinet doors and drawer alignment (should open/close smoothly)
☐ Countertop edge condition (chips, uneven joins)
☐ Sink mounting secure, no gaps at wall
☐ Kitchen tap water flow and hot/cold operation
☐ Hood and hob functionality
☐ Dishwasher connection (if included)
☐ Under-sink cabinet for leaks
☐ Kitchen floor tiles hollow check

Bedrooms:
☐ Bedroom door — closes and locks properly
☐ Flooring condition (vinyl/timber scratches, hollow sections)
☐ Wardrobe doors operate smoothly
☐ Window operation (open/close, latches work)
☐ Window seals (tissue test — no drafts at corners)
☐ Power points and light switches

Bathrooms:
☐ Water pressure (turn on shower, sink simultaneously — minimum flow maintained)
☐ Hot water reaches within 30 seconds
☐ Toilet flush — complete clear, no continuous running
☐ Basin seal at wall (no gaps or loose caulking)
☐ Wall tiles aligned and grout clean
☐ Floor drain effective (pour water, check drainage speed)
☐ No water seepage at base of walls
☐ Shower glass or curtain rail secure
☐ Exhaust fan operation

Overall:
☐ All windows and sliding doors operate smoothly
☐ Check ceiling corners for water stain marks (indicates seepage from above)
☐ Air-conditioning units installed and functional (all modes: cool, fan, auto)
☐ Intercom/smart home system functional

Documenting and Reporting Defects

Photograph every defect. Include your hand or a reference object for scale.

Submit all defects to the developer within the first 30 days of key collection (ideally on the same day). Use the developer’s official defect submission form or portal.

Keep copies of everything.

📲 VVIP Preview — April 11 Launch
Join our VVIP group for priority access, floor plan information, and post-purchase support including renovation recommendations and defect inspection guidance.

WhatsApp: +65 8488 8648
Call: +65 8488 8648

How long is the defects liability period for Tengah Garden Walk EC?

The Defects Liability Period (DLP) for Tengah Garden Walk EC is 1 year from the TOP date (estimated 2029–2030). During this period, Qingjian Realty must rectify any defects in workmanship, materials, or structure at no cost to you.

What should I check at Tengah Garden Walk EC key collection?

Check: hollow tiles (knock test), tile alignment and grout, wall and ceiling cracks, door and window operation, power socket functionality, water pressure and hot water, toilet flush, air-conditioning, balcony seals, and any signs of water seepage at ceilings or walls.

How do I report defects to the developer after Tengah Garden Walk EC key collection?

Submit all defects in writing using the developer’s official defect submission form. Photograph every defect with scale reference. Submit within the first 30 days of key collection and keep copies of all correspondence.

More: Tengah Garden Walk EC developer track record and quality.

Also: Tengah Garden Walk EC renovation guide after key collection.

???? Get a Free Property Valuation from Alvin

Need an honest, data-driven valuation on this project, your existing property, or a comparison? WhatsApp Alvin Tan directly — CEA-licensed, ERA Realty, no obligation. Same-day reply during office hours.

  • ✅ Free showflat priority booking
  • ✅ ABSD + BSD + financing eligibility analysis
  • ✅ Floor plan packs & price list (where available)
  • ✅ HDB upgrader pathway planning
???? WhatsApp Alvin Now → +65 8488 8648
Alvin Tan
Property Agent
CEA R072324C
ERA Realty Network L3002382K

Join The Discussion

Chat with Alvin (CEA)